• Home
  • About us
  • News
  • Product
  • Service
  • Project cases
  • Contact Us
Hotline:86-13813813329
Nanjing Meetall Sports Co., Ltd
  • Home
  • About us
    • Company
  • News
    • News
  • Product
    • RUBBER GRANULESGYM RUBBER FLOORINGPLAYGROUND RUBBER FLOORINGWALKWAY, GARDEN, HORSE STABLE RUBBER FLOORINGRUNNING TRACK & SPORTS FIELDPVC SPORTS FLOORINGMACHINES FOR TRACK & FIELDPLAYGROUND EQUIPMENTS
  • Service
  • Project cases
  • Contact Us

Product

Product

RUBBER GRANULES
GYM RUBBER FLOORING
PLAYGROUND RUBBER FLOORING
WALKWAY, GARDEN, HORSE STABLE RUBBER FLOORING
RUNNING TRACK & SPORTS FIELD
Prefabricated Athletic Running Track Composite Running Track Air Permeable Running Track Compress Type Running Track Mixed Type Running Track Basketball courts Badminton Courts Tennis courts
PVC SPORTS FLOORING
MACHINES FOR TRACK & FIELD
PLAYGROUND EQUIPMENTS

Home-Product-RUNNING TRACK & SPORTS FIELD

RUNNING TRACK & SPORTS FIELD
Name:Compress Type Running Track
Model:04
Brief:

Compress running track is compacted by 8-9 mm SBR elastic layer and 4-5 mm EPDM surface. The construction technology is simple. But because the surface is too smooth, do not generally used.

详细介绍

Compress running track is compacted by 8-9 mm SBR elastic layer and 4-5 mm EPDM surface. The construction technology is simple. But because the surface is too smooth, do not generally used. 

Character:

1.the surface is very smooth, more suitable for outdoor courts.
2. Good elastic
EPDM granules could keep the good elastic even under the condition of low temperature.
3. Chemical stability
EPDM granules could be used for kinds of difficult weather condition, with chemical stability, ozone aging and thermal oxidative aging character.

--Base Binder

Clean the ground, and brush the glue at the cement ground .

 

--Flexible level installation points

Mix the binder with black granules by standard proportion, and mix the materials totally by mix machine.
Install the rubber floor by paving machine, keep the thickness around 8-9mm thick. All these work should be done before the base binder cured.
When finished the installation of paving machine, keep the rubber floor away from the damage. About 24 hours later, when it cured, the flexible level of rubber floor is finished.

 

 

 

-- EPDM level installation points

Mix the binder with colored EPDM granules by standard proportion, and mix the materials totally by mix machine. 
Install the rubber floor by paving machine, keep the thickness around 4-5mm thick. When finished the installation of paving machine, keep the rubber floor away from the damage. About 24 hours later, when it cured, the EPDM level of rubber floor is finished.

 
Related Products

Prefabricated Athletic Running Track

Composite Running Track

Air Permeable Running Track

Compress Type Running Track
About us
Company
News
News
Product
RUBBER GRANULES
GYM RUBBER FLOORING
PLAYGROUND RUBBER FLOORING
WALKWAY, GARDEN, HORSE STABLE RUBBER FLOORING
RUNNING TRACK & SPORTS FIELD
PVC SPORTS FLOORING
Service
service

Contact Us

TeL:  86-13813813329

Fax: 025-87133265

Contact: Jane

Email: info@meetall-sports.com

Copyright 2010 Nanjing Meetall Sports Co., Ltd
|管理后台

Links: